1、根据除尘系统的吸尘量确定烟气脱硫塔的收尘量,确定排灰周期。
1. Determine the amount of dust collection in the flue gas desulfurization tower according to the dust absorption capacity of the dust removal system and determine the ash discharge cycle.
2、根据高压水源的压力变化情况来确定排水周期。
2. To determine the drainage period according to the pressure change of the high pressure water source.
3、经常检查烟气脱硫塔设备清灰和喷扫用高压水源系统是否正常喷吹,如有异常,即检查闸阀、水泵有无失灵或损坏,并及时维修更换。
3, check the flue gas desulfurization tower equipment ash cleaning and high-pressure water supply system normally. If there is any abnormality, check whether the gate valve or pump is damaged or damaged, and repair and replace it in time.
4、根据设备运行阻力的变化波动,定期检查设备的运行是否正常。
4. According to the fluctuation of the operating resistance of the equipment, check the operation of the equipment regularly.
5、根据易损件清单定期检查易损件的使用情况并及时更换。
5. Regularly check the use of vulnerable parts according to the list of vulnerable parts and replace them in time.
6、定期对设备上需润滑的部位补充润滑油。轴承润滑点每周2次补充润滑脂。
6, replenish lubricating oil regularly to the parts of the equipment that need to be lubricated. The lubrication points of the bearing are supplemented 2 times a week.
7、定期检查差压变送器是否有堵灰、封浆现象,及时进行清理。
7, regularly check whether the differential pressure transmitter has dust plugging, sealing phenomenon, timely cleaning.
8、运行前应在水池中加满清水,并向除尘器供水至溢流口有水溢出,检查是否符合要求,供水系统是否畅通,排灰口水封要严密不漏。
8, before running, we should fill up the clear water in the pool, and supply the water to the dust collector to overflow, and check whether it meets the requirements, whether the water supply system is open or not, and the water seal of the ash discharge must be tight.
9、运行前,应先开引风机,再向供水系统供水。停炉时,应在关闭引风机前停止向系统供水。
9, before the operation, first open the fan, and then water supply system. When the furnace is stopped, the water supply should be stopped before the blower is closed.